
Facility Upgrades
We made an existing overhead door opening larger, installed a larger concrete ramp, and completed the necessary removals to support the upgrade.

We made an existing overhead door opening larger, installed a larger concrete ramp, and completed the necessary removals to support the upgrade.

Removed and reinstalled wall panels, insulation, soffits, and trim for a fully updated exterior.

CBK can equip your facility with dock laser line projectors, which provide a clear, visible guide to help align your semi perfectly, day or night. This will improve accuracy, reduce stress, and allow you to dock with confidence every time.

CBK’s special projects team replaced a bank of dock levelers, dock doors, and added truck restraints on our customer’s facility.

Our customer wanted the same concrete wall panels to match their existing walls and asked us if we could make them since they were discontinued,


Installed a crane runway and bridge crane to allow our customer to utilize their manufacturing space more efficiently!

CBK removed the dock leveler, cut the concrete pit walls down, reformed the walls, installed new edge angle, re-poured concrete, and reinstalled the dock leveler.

Fabricated and installed 18 pipe bollards in South Haven, Michigan.
